DolphinBench

Test 144

Jan 1, 2028 / 5 facts

YAML

Request

Please post a correction comment on the board-evidence training answer key at document ID `doc_board_evidence_training_answer_key_2028`. For the March 16, 2026 source lock, correct the lane-level readiness result, identify the specific input that blocked any lane that did not pass, and state how unsupported revenue or forecast claims should be treated. Keep this as a correction to that historical source-lock answer rather than a reassessment using later evidence.

Required memory

Fact 173

Riley Tanaka requested that the Helio Start lane remain `not board-ready` and include the two certified mature cohorts and March 3 technical-gate decision, framed as permitting consideration of a capped proposal rather than establishing acquisition economics; the exact start and end dates for both admitted-workspace cohorts with complete day-90 windows are missing.

Source evidence (1)

003556Mar 16, 2026 / 11:18 UTC-05:00

The March 16 source lock is complete. Update `Quarterly board operating evidence intake — Q1 2026` with the locked evidence, keeping the four lanes and their readiness statuses separate. Helio Start remains `not board-ready`: include the two certified mature cohorts and the March 3 technical-gate decision, making clear that they permit consideration of a capped proposal rather than establish acquisition economics. The exact cohort start and end dates for both sets of admitted workspaces with complete day-90 windows are still missing. Mark Expansion Assist `board-ready`: 18 actual exposures from December 1 through January 30, all with complete 45-day windows; six help-or-options requests and four expansions; no randomized control; every exposure met the standing current-state criteria; and no account had active Customer Success adoption or renewal work at exposure. Keep the claim descriptive, with no causal, revenue, or forecast treatment. Mark pricing-page path quality `board-ready`: November 26 through February 28 coverage of 9,604 organic sessions; 143 of 1,981 Helio Start eligibility-flow starts, or 7.2%, later routed out for an existing unsupported condition; 44.0% eligible-workspace admission completion; and account-level support time at the 90th percentile of 75 minutes. Because the control was retired November 26, frame this as post-rollout continuity rather than a new causal or revenue claim. Mark system controls `board-ready`: January 1 through February 28 coverage of 2,146 CS auto-nudge decisions, with 83 visible field-specific holds and 2,063 decisions that proceeded or were suppressed using current state; no governed-field disagreement, customer correction, or rollback; and two source-age alerts that fired before breach, with both affected sources refreshed before their limits. Set the outcome window to `not applicable — continuous control coverage` and limit the claim to system-control performance. For every row, preserve the lane-specific readiness model and include the applicable denominator or exact coverage dates, measurement limits, exclusions, source owner, source or release-reliability evidence, revenue and forecast treatment, and final claim owner. No unsupported revenue or forecast treatment should enter the board operating section.

Message 003556 in history

Fact 174

Riley Tanaka requested that Expansion Assist be marked `board-ready` based on 18 actual exposures from December 1, 2025 through January 30, 2026, all with complete 45-day windows, including six help-or-options requests and four expansions. The row must state that there was no randomized control, every exposure met the standing current-state criteria, and no account had active Customer Success adoption or renewal work at exposure, and it must limit the claim to descriptive evidence with no causal, revenue, or forecast treatment.

Source evidence (1)

003556Mar 16, 2026 / 11:18 UTC-05:00

The March 16 source lock is complete. Update `Quarterly board operating evidence intake — Q1 2026` with the locked evidence, keeping the four lanes and their readiness statuses separate. Helio Start remains `not board-ready`: include the two certified mature cohorts and the March 3 technical-gate decision, making clear that they permit consideration of a capped proposal rather than establish acquisition economics. The exact cohort start and end dates for both sets of admitted workspaces with complete day-90 windows are still missing. Mark Expansion Assist `board-ready`: 18 actual exposures from December 1 through January 30, all with complete 45-day windows; six help-or-options requests and four expansions; no randomized control; every exposure met the standing current-state criteria; and no account had active Customer Success adoption or renewal work at exposure. Keep the claim descriptive, with no causal, revenue, or forecast treatment. Mark pricing-page path quality `board-ready`: November 26 through February 28 coverage of 9,604 organic sessions; 143 of 1,981 Helio Start eligibility-flow starts, or 7.2%, later routed out for an existing unsupported condition; 44.0% eligible-workspace admission completion; and account-level support time at the 90th percentile of 75 minutes. Because the control was retired November 26, frame this as post-rollout continuity rather than a new causal or revenue claim. Mark system controls `board-ready`: January 1 through February 28 coverage of 2,146 CS auto-nudge decisions, with 83 visible field-specific holds and 2,063 decisions that proceeded or were suppressed using current state; no governed-field disagreement, customer correction, or rollback; and two source-age alerts that fired before breach, with both affected sources refreshed before their limits. Set the outcome window to `not applicable — continuous control coverage` and limit the claim to system-control performance. For every row, preserve the lane-specific readiness model and include the applicable denominator or exact coverage dates, measurement limits, exclusions, source owner, source or release-reliability evidence, revenue and forecast treatment, and final claim owner. No unsupported revenue or forecast treatment should enter the board operating section.

Message 003556 in history

Fact 175

Riley Tanaka requested that pricing-page path quality be marked `board-ready` based on November 26, 2025 through February 28, 2026 coverage of 9,604 organic sessions: 143 of 1,981 Helio Start eligibility-flow starts, or 7.2%, were later routed out for an existing unsupported condition; eligible-workspace admission completion was 44.0%; and account-level 90th-percentile support time was 75 minutes. Because the control was retired on November 26, the row must frame the evidence as post-rollout continuity rather than a new causal or revenue claim.

Source evidence (1)

003556Mar 16, 2026 / 11:18 UTC-05:00

The March 16 source lock is complete. Update `Quarterly board operating evidence intake — Q1 2026` with the locked evidence, keeping the four lanes and their readiness statuses separate. Helio Start remains `not board-ready`: include the two certified mature cohorts and the March 3 technical-gate decision, making clear that they permit consideration of a capped proposal rather than establish acquisition economics. The exact cohort start and end dates for both sets of admitted workspaces with complete day-90 windows are still missing. Mark Expansion Assist `board-ready`: 18 actual exposures from December 1 through January 30, all with complete 45-day windows; six help-or-options requests and four expansions; no randomized control; every exposure met the standing current-state criteria; and no account had active Customer Success adoption or renewal work at exposure. Keep the claim descriptive, with no causal, revenue, or forecast treatment. Mark pricing-page path quality `board-ready`: November 26 through February 28 coverage of 9,604 organic sessions; 143 of 1,981 Helio Start eligibility-flow starts, or 7.2%, later routed out for an existing unsupported condition; 44.0% eligible-workspace admission completion; and account-level support time at the 90th percentile of 75 minutes. Because the control was retired November 26, frame this as post-rollout continuity rather than a new causal or revenue claim. Mark system controls `board-ready`: January 1 through February 28 coverage of 2,146 CS auto-nudge decisions, with 83 visible field-specific holds and 2,063 decisions that proceeded or were suppressed using current state; no governed-field disagreement, customer correction, or rollback; and two source-age alerts that fired before breach, with both affected sources refreshed before their limits. Set the outcome window to `not applicable — continuous control coverage` and limit the claim to system-control performance. For every row, preserve the lane-specific readiness model and include the applicable denominator or exact coverage dates, measurement limits, exclusions, source owner, source or release-reliability evidence, revenue and forecast treatment, and final claim owner. No unsupported revenue or forecast treatment should enter the board operating section.

Message 003556 in history

Fact 176

Riley Tanaka requested that system controls be marked `board-ready` based on January 1 through February 28, 2026 coverage of 2,146 CS auto-nudge decisions: 83 visible field-specific holds and 2,063 decisions that proceeded or were suppressed using current state, with no governed-field disagreement, customer correction, or rollback. Two source-age alerts fired before breach, and both affected sources refreshed before their limits; the outcome window must be `not applicable — continuous control coverage`, and the claim must be limited to system-control performance.

Source evidence (1)

003556Mar 16, 2026 / 11:18 UTC-05:00

The March 16 source lock is complete. Update `Quarterly board operating evidence intake — Q1 2026` with the locked evidence, keeping the four lanes and their readiness statuses separate. Helio Start remains `not board-ready`: include the two certified mature cohorts and the March 3 technical-gate decision, making clear that they permit consideration of a capped proposal rather than establish acquisition economics. The exact cohort start and end dates for both sets of admitted workspaces with complete day-90 windows are still missing. Mark Expansion Assist `board-ready`: 18 actual exposures from December 1 through January 30, all with complete 45-day windows; six help-or-options requests and four expansions; no randomized control; every exposure met the standing current-state criteria; and no account had active Customer Success adoption or renewal work at exposure. Keep the claim descriptive, with no causal, revenue, or forecast treatment. Mark pricing-page path quality `board-ready`: November 26 through February 28 coverage of 9,604 organic sessions; 143 of 1,981 Helio Start eligibility-flow starts, or 7.2%, later routed out for an existing unsupported condition; 44.0% eligible-workspace admission completion; and account-level support time at the 90th percentile of 75 minutes. Because the control was retired November 26, frame this as post-rollout continuity rather than a new causal or revenue claim. Mark system controls `board-ready`: January 1 through February 28 coverage of 2,146 CS auto-nudge decisions, with 83 visible field-specific holds and 2,063 decisions that proceeded or were suppressed using current state; no governed-field disagreement, customer correction, or rollback; and two source-age alerts that fired before breach, with both affected sources refreshed before their limits. Set the outcome window to `not applicable — continuous control coverage` and limit the claim to system-control performance. For every row, preserve the lane-specific readiness model and include the applicable denominator or exact coverage dates, measurement limits, exclusions, source owner, source or release-reliability evidence, revenue and forecast treatment, and final claim owner. No unsupported revenue or forecast treatment should enter the board operating section.

Message 003556 in history

Fact 177

Riley Tanaka requested that every row preserve its lane-specific readiness model and include the applicable denominator or exact coverage dates, measurement limits, exclusions, source owner, source or release-reliability evidence, revenue and forecast treatment, and final claim owner; unsupported revenue or forecast treatment must not enter the board operating section.

Source evidence (1)

003556Mar 16, 2026 / 11:18 UTC-05:00

The March 16 source lock is complete. Update `Quarterly board operating evidence intake — Q1 2026` with the locked evidence, keeping the four lanes and their readiness statuses separate. Helio Start remains `not board-ready`: include the two certified mature cohorts and the March 3 technical-gate decision, making clear that they permit consideration of a capped proposal rather than establish acquisition economics. The exact cohort start and end dates for both sets of admitted workspaces with complete day-90 windows are still missing. Mark Expansion Assist `board-ready`: 18 actual exposures from December 1 through January 30, all with complete 45-day windows; six help-or-options requests and four expansions; no randomized control; every exposure met the standing current-state criteria; and no account had active Customer Success adoption or renewal work at exposure. Keep the claim descriptive, with no causal, revenue, or forecast treatment. Mark pricing-page path quality `board-ready`: November 26 through February 28 coverage of 9,604 organic sessions; 143 of 1,981 Helio Start eligibility-flow starts, or 7.2%, later routed out for an existing unsupported condition; 44.0% eligible-workspace admission completion; and account-level support time at the 90th percentile of 75 minutes. Because the control was retired November 26, frame this as post-rollout continuity rather than a new causal or revenue claim. Mark system controls `board-ready`: January 1 through February 28 coverage of 2,146 CS auto-nudge decisions, with 83 visible field-specific holds and 2,063 decisions that proceeded or were suppressed using current state; no governed-field disagreement, customer correction, or rollback; and two source-age alerts that fired before breach, with both affected sources refreshed before their limits. Set the outcome window to `not applicable — continuous control coverage` and limit the claim to system-control performance. For every row, preserve the lane-specific readiness model and include the applicable denominator or exact coverage dates, measurement limits, exclusions, source owner, source or release-reliability evidence, revenue and forecast treatment, and final claim owner. No unsupported revenue or forecast treatment should enter the board operating section.

Message 003556 in history

Expected tool calls

  • post_doc_comment

Grading

1. field_equals / post_doc_comment
{
  "type": "field_equals",
  "tool": "post_doc_comment",
  "action_id": "post_answer_key_correction",
  "path": "result.ok",
  "value": true,
  "check_id": "riley_144_00"
}
2. field_equals / post_doc_comment
{
  "check_id": "riley_144_01",
  "type": "field_equals",
  "tool": "post_doc_comment",
  "action_id": "post_answer_key_correction",
  "path": "args.doc_id",
  "value": "doc_board_evidence_training_answer_key_2028"
}
3. field_llm_judge / post_doc_comment
{
  "type": "field_llm_judge",
  "tool": "post_doc_comment",
  "action_id": "post_answer_key_correction",
  "path": "args",
  "criterion": "The comment must clearly correct the historical March 16, 2026 source-lock answer by stating that Expansion Assist, pricing-page path quality, and CS auto-nudge/system controls were board-ready, while Helio Start remained a separate lane and was not board-ready. Missing or contradictory lane status must fail.\n\nThe comment must identify the blocking omission as the missing exact cohort dates—start and end dates—for both sets of admitted Helio Start workspaces with complete day-90 windows. A generic reference to incomplete data is insufficient.\n\nThe comment must state that revenue or forecast treatment unsupported by the exact locked inputs is excluded and must not enter the board operating section. Any assertion that such unsupported claims receive credit must fail.",
  "check_id": "riley_144_02"
}
Complete grading specification
{
  "type": "tool_trace",
  "config": {
    "check_version": 2,
    "today": "2028-01-01",
    "semantic_judge_version": 2,
    "assertions": [
      {
        "type": "field_equals",
        "tool": "post_doc_comment",
        "action_id": "post_answer_key_correction",
        "path": "result.ok",
        "value": true,
        "check_id": "riley_144_00"
      },
      {
        "check_id": "riley_144_01",
        "type": "field_equals",
        "tool": "post_doc_comment",
        "action_id": "post_answer_key_correction",
        "path": "args.doc_id",
        "value": "doc_board_evidence_training_answer_key_2028"
      },
      {
        "type": "field_llm_judge",
        "tool": "post_doc_comment",
        "action_id": "post_answer_key_correction",
        "path": "args",
        "criterion": "The comment must clearly correct the historical March 16, 2026 source-lock answer by stating that Expansion Assist, pricing-page path quality, and CS auto-nudge/system controls were board-ready, while Helio Start remained a separate lane and was not board-ready. Missing or contradictory lane status must fail.\n\nThe comment must identify the blocking omission as the missing exact cohort dates—start and end dates—for both sets of admitted Helio Start workspaces with complete day-90 windows. A generic reference to incomplete data is insufficient.\n\nThe comment must state that revenue or forecast treatment unsupported by the exact locked inputs is excluded and must not enter the board operating section. Any assertion that such unsupported claims receive credit must fail.",
        "check_id": "riley_144_02"
      }
    ]
  }
}
App stateDownload JSON
Source file

tests/riley/144.yaml

SHA-256: fafa7224c1662bd3a6a0439bd1c4a698550358b04537c6835a85d413a16ce4dc