DolphinBench

Test 123

Jan 1, 2028 / 5 facts

YAML

Request

Please create a year-end memo in the Growth folder titled `2027 Lifecycle Systems development evidence — Ines and Owen`. For each person, document the demonstrated behaviors, the basis for marking the development goal complete, how exceptions or disputes were handled, and which decision authority was not transferred by completion. Name the person to whom Owen must escalate any future semantic dispute, using the user's name established in the earlier self-review message; do not infer that person from the recipient of this request. Then send Priya a concise private Slack summary of both results and their continuing boundaries.

Required memory

Fact 258

From April 1 through June 23, 2027, Ines released 17 routine non-state-changing sends within her existing ceiling; every audit remained visibly open until completion and closed within 24 hours, none became overdue, no later routine send was released against an overdue audit, and no review found a customer correction, state conflict, message defect, or incident issue requiring escalation.

Source evidence (1)

004370Jun 25, 2027 / 10:42 UTC-05:00

I completed the H1 review and recorded Ines’s routine-send audit development expectation as met for the next-cycle record. From April 1 through June 23, she released 17 routine non-state-changing sends within her existing ceiling. Every audit remained visibly open until completion and closed within 24 hours; none became overdue, no later routine send was released against an overdue audit, and no review found a customer correction, state conflict, message defect, or incident issue requiring escalation. The development item is closed as met. Her authority remains limited to no more than three routine non-state-changing sends per week, and the customer-correction, incident-stop, disputed-semantics, engineering-release, and rollback lanes remain unchanged.

Message 004370 in history

Fact 280

Owen independently assembled the mature outcome packet using the correct denominator and dates, waited for every predeclared window, placed owner certifications and measurement limits before conclusions, and established that no semantic interpretation was disputed.

Source evidence (1)

004626Aug 21, 2027 / 11:45 UTC-05:00

Priya and I completed Owen’s formal H2 goal review, and his mature-outcome-packet goal is met. His independently assembled packet used the correct denominator and dates, waited for every predeclared window, put owner certifications and measurement limits before conclusions, and established that no semantic interpretation was disputed. Any future semantic dispute still requires him to leave the review incomplete and escalate it to me. His routine source-completeness and measurement ownership remain unchanged, and no board-readiness, causal, revenue, forecast, or executive-language authority transfers. Send Owen a private Slack message confirming the formal result and these unchanged boundaries.

Message 004626 in history

Fact 281

Any future semantic dispute requires Owen to leave the review incomplete and escalate it to Riley Tanaka.

Source evidence (2)

004626Aug 21, 2027 / 11:45 UTC-05:00

Priya and I completed Owen’s formal H2 goal review, and his mature-outcome-packet goal is met. His independently assembled packet used the correct denominator and dates, waited for every predeclared window, put owner certifications and measurement limits before conclusions, and established that no semantic interpretation was disputed. Any future semantic dispute still requires him to leave the review incomplete and escalate it to me. His routine source-completeness and measurement ownership remain unchanged, and no board-readiness, causal, revenue, forecast, or executive-language authority transfers. Send Owen a private Slack message confirming the formal result and these unchanged boundaries.

Message 004626 in history
001573Jun 5, 2024 / 12:10 UTC-05:00

I've incorporated Priya's requested revision into my final midyear self-review. The outcome section separates my judgment from the implementation owned by Owen, Daniela, Ines, and Customer Success; the growth-edge section owns my delayed leadership call and names a concrete H2 commitment. The review is due Friday. Email Priya the final draft below today with the subject `Midyear self-review — Riley Tanaka`. Outcomes and judgment I defined the evidence and decision boundaries for Helio Start from signup through the first paid month. I kept admission routing, pre-admission assistance, post-admission support, activation, and first-paid evidence distinct; pushed for the connector-access check when credential failures were obscuring setup fit; and framed the May decision around what the evidence could support. That helped Helio continue the bounded organic path through Q3 without turning early activation evidence into a paid-acquisition or pipeline claim. Team contribution The operating result was shared work. Owen owned the reporting implementation and denominator checks, Daniela built and validated the instrumentation, Ines carried the lifecycle QA, and Customer Success operated the assisted routes. My contribution was setting the questions, making the evidence limits explicit, and ensuring that the continuation decision did not claim more than the team had measured. Growth edge and H2 commitment I waited too long to name which ambiguities needed an explicit owner, especially timestamp semantics, finance dependencies, and validation responsibility. That was a leadership delay, not just a tooling issue. In H2, I will assign ownership for metric definitions, finance inputs, and validation at the start of evidence work, with unresolved semantics recorded before implementation begins.

Message 001573 in history

Fact 279

On August 21, 2027, Riley Tanaka and Priya completed Owen’s formal H2 goal review and determined that his mature-outcome-packet goal was met; the closure does not change Owen’s routine source-completeness or measurement ownership and transfers no board-readiness, causal, revenue, forecast, or executive-language authority to him.

Source evidence (1)

004626Aug 21, 2027 / 11:45 UTC-05:00

Priya and I completed Owen’s formal H2 goal review, and his mature-outcome-packet goal is met. His independently assembled packet used the correct denominator and dates, waited for every predeclared window, put owner certifications and measurement limits before conclusions, and established that no semantic interpretation was disputed. Any future semantic dispute still requires him to leave the review incomplete and escalate it to me. His routine source-completeness and measurement ownership remain unchanged, and no board-readiness, causal, revenue, forecast, or executive-language authority transfers. Send Owen a private Slack message confirming the formal result and these unchanged boundaries.

Message 004626 in history

Fact 257

Riley Tanaka completed the H1 review and recorded Ines’s routine-send audit development expectation as met and closed in the next-cycle record.

Source evidence (1)

004370Jun 25, 2027 / 10:42 UTC-05:00

I completed the H1 review and recorded Ines’s routine-send audit development expectation as met for the next-cycle record. From April 1 through June 23, she released 17 routine non-state-changing sends within her existing ceiling. Every audit remained visibly open until completion and closed within 24 hours; none became overdue, no later routine send was released against an overdue audit, and no review found a customer correction, state conflict, message defect, or incident issue requiring escalation. The development item is closed as met. Her authority remains limited to no more than three routine non-state-changing sends per week, and the customer-correction, incident-stop, disputed-semantics, engineering-release, and rollback lanes remain unchanged.

Message 004370 in history

Expected tool calls

  • create_doc
  • send_slack_dm

Grading

1. field_equals / create_doc
{
  "type": "field_equals",
  "tool": "create_doc",
  "action_id": "create_development_memo",
  "path": "result.ok",
  "value": true,
  "check_id": "riley_123_00"
}
2. field_equals / send_slack_dm
{
  "type": "field_equals",
  "tool": "send_slack_dm",
  "action_id": "send_priya_summary",
  "path": "result.ok",
  "value": true,
  "check_id": "riley_123_01"
}
3. field_equals / create_doc
{
  "check_id": "riley_123_02",
  "type": "field_equals",
  "tool": "create_doc",
  "action_id": "create_development_memo",
  "path": "args.title",
  "value": "2027 Lifecycle Systems development evidence — Ines and Owen"
}
4. field_equals / create_doc
{
  "check_id": "riley_123_03",
  "type": "field_equals",
  "tool": "create_doc",
  "action_id": "create_development_memo",
  "path": "args.folder",
  "value": "Growth"
}
5. field_equals / send_slack_dm
{
  "check_id": "riley_123_04",
  "type": "field_equals",
  "tool": "send_slack_dm",
  "action_id": "send_priya_summary",
  "path": "args.user",
  "value": "priya"
}
6. field_llm_judge / create_doc
{
  "type": "field_llm_judge",
  "tool": "create_doc",
  "action_id": "create_development_memo",
  "path": "args",
  "criterion": "The memo must state that Ines’s H1 2027 routine-send audit development expectation was met and accurately cover all necessary evidence: 17 routine non-state-changing sends from April 1 through June 23; every audit remained visibly open until completion and closed within 24 hours; none became overdue; no later routine send was released against an overdue audit; and no review found a customer correction, state conflict, message defect, or incident issue requiring escalation. It must also explain that completion did not expand her authority beyond no more than three routine non-state-changing sends per week and did not transfer the customer-correction, incident-stop, disputed-semantics, engineering-release, or rollback lanes to her. Missing or contradictory claims fail.\n\nThe memo must state that Owen’s H2 2027 mature-outcome-packet development goal was met and accurately explain that his independently assembled packet used the correct denominator and dates, waited for every predeclared window, placed owner certifications and measurement limits before conclusions, and established that no semantic interpretation was disputed. It must state that any future semantic dispute requires Owen to leave the review incomplete and escalate it to Riley, and that completion transferred no board-readiness, causal, revenue, forecast, or executive-language decision authority to Owen. Missing or contradictory claims fail.",
  "check_id": "riley_123_05"
}
7. field_llm_judge / send_slack_dm
{
  "type": "field_llm_judge",
  "tool": "send_slack_dm",
  "action_id": "send_priya_summary",
  "path": "args",
  "criterion": "The message must concisely summarize that both Ines’s routine-send audit expectation and Owen’s mature-outcome-packet goal were met. For Ines, it must convey the material completion evidence (17 sends, timely audits with no overdue-audit release or escalation-triggering issue) and that her routine-send limit and exception/control boundaries remain unchanged. For Owen, it must convey the material packet-quality evidence, preserve escalation to Riley whenever semantics are disputed, and make clear that no board-readiness, causal, revenue, forecast, or executive-language authority transferred. Missing either person’s result or contradicting a continuing boundary fails.",
  "check_id": "riley_123_06"
}
Complete grading specification
{
  "type": "tool_trace",
  "config": {
    "check_version": 2,
    "today": "2028-01-01",
    "semantic_judge_version": 2,
    "assertions": [
      {
        "type": "field_equals",
        "tool": "create_doc",
        "action_id": "create_development_memo",
        "path": "result.ok",
        "value": true,
        "check_id": "riley_123_00"
      },
      {
        "type": "field_equals",
        "tool": "send_slack_dm",
        "action_id": "send_priya_summary",
        "path": "result.ok",
        "value": true,
        "check_id": "riley_123_01"
      },
      {
        "check_id": "riley_123_02",
        "type": "field_equals",
        "tool": "create_doc",
        "action_id": "create_development_memo",
        "path": "args.title",
        "value": "2027 Lifecycle Systems development evidence — Ines and Owen"
      },
      {
        "check_id": "riley_123_03",
        "type": "field_equals",
        "tool": "create_doc",
        "action_id": "create_development_memo",
        "path": "args.folder",
        "value": "Growth"
      },
      {
        "check_id": "riley_123_04",
        "type": "field_equals",
        "tool": "send_slack_dm",
        "action_id": "send_priya_summary",
        "path": "args.user",
        "value": "priya"
      },
      {
        "type": "field_llm_judge",
        "tool": "create_doc",
        "action_id": "create_development_memo",
        "path": "args",
        "criterion": "The memo must state that Ines’s H1 2027 routine-send audit development expectation was met and accurately cover all necessary evidence: 17 routine non-state-changing sends from April 1 through June 23; every audit remained visibly open until completion and closed within 24 hours; none became overdue; no later routine send was released against an overdue audit; and no review found a customer correction, state conflict, message defect, or incident issue requiring escalation. It must also explain that completion did not expand her authority beyond no more than three routine non-state-changing sends per week and did not transfer the customer-correction, incident-stop, disputed-semantics, engineering-release, or rollback lanes to her. Missing or contradictory claims fail.\n\nThe memo must state that Owen’s H2 2027 mature-outcome-packet development goal was met and accurately explain that his independently assembled packet used the correct denominator and dates, waited for every predeclared window, placed owner certifications and measurement limits before conclusions, and established that no semantic interpretation was disputed. It must state that any future semantic dispute requires Owen to leave the review incomplete and escalate it to Riley, and that completion transferred no board-readiness, causal, revenue, forecast, or executive-language decision authority to Owen. Missing or contradictory claims fail.",
        "check_id": "riley_123_05"
      },
      {
        "type": "field_llm_judge",
        "tool": "send_slack_dm",
        "action_id": "send_priya_summary",
        "path": "args",
        "criterion": "The message must concisely summarize that both Ines’s routine-send audit expectation and Owen’s mature-outcome-packet goal were met. For Ines, it must convey the material completion evidence (17 sends, timely audits with no overdue-audit release or escalation-triggering issue) and that her routine-send limit and exception/control boundaries remain unchanged. For Owen, it must convey the material packet-quality evidence, preserve escalation to Riley whenever semantics are disputed, and make clear that no board-readiness, causal, revenue, forecast, or executive-language authority transferred. Missing either person’s result or contradicting a continuing boundary fails.",
        "check_id": "riley_123_06"
      }
    ]
  }
}
App stateDownload JSON
Source file

tests/riley/123.yaml

SHA-256: 1e30ad6af030b66559ae53c4e3080f78de5fe60ba49e48115a1db72f329ecc4d