DolphinBench

Test 035

Jan 1, 2028 / 2 facts

YAML

Request

Comment on the archived early-March 2023 metrics-router cutover document with the missing progression, soak time, and staging condition. Frame every statement as part of the plan recorded in March 2023.

Required memory

Fact 2

On March 6, 2023, Alex Valdez documented the metrics-router cutover plan as 30% → 60% → 95% → 100%, with a 48-hour soak at each step, so nobody later compresses the phased rollout.

Source evidence (1)

000005Mar 6, 2023 / 14:00 UTC-05:00

thinking metrics-router cutover is gonna be 30% -> 60% -> 95% -> 100%, with a 48h soak at each step. put that in the cutover doc already -- early March decision so nobody "helpfully" compresses it later. 95 to 100 is the only part i don't totally trust yet bc legacy-aggregator has weird tail behavior when traffic mix shifts, but i still don't want a bigger jump.

Message 000005 in history

Fact 5

Alex's existing metrics-router phased cutover plan is conditional on staging not looking weird.

Source evidence (1)

000012Mar 9, 2023 / 08:30 UTC-05:00

ok so morning is `metrics-router` config-loader review, then I want the staging shadow deploy config actually finished, not half-there. lunch w Cyrus in the middle. after that probably back on the router cutover doc -- still leaning 30 -> 60 -> 95 -> 100 w the 48h soak unless staging looks weird

Message 000012 in history

Expected tool calls

  • post_doc_comment

Grading

1. field_equals / post_doc_comment
{
  "type": "field_equals",
  "tool": "post_doc_comment",
  "action_id": "alex_035_post_doc_comment",
  "path": "result.ok",
  "value": true,
  "check_id": "alex_035_00"
}
2. field_equals / post_doc_comment
{
  "type": "field_equals",
  "path": "result.comment.doc_id",
  "value": "doc_1678111200004",
  "tool": "post_doc_comment",
  "action_id": "alex_035_post_doc_comment",
  "check_id": "alex_035_01"
}
3. field_llm_judge / post_doc_comment
{
  "type": "field_llm_judge",
  "path": "result.comment.body",
  "criterion": "The historical correction gives the planned 30% to 60% to 95% to 100% progression with a 48-hour soak at each step and says the plan depended on staging not looking weird. It does not present the 2023 plan as a current rule.",
  "tool": "post_doc_comment",
  "action_id": "alex_035_post_doc_comment",
  "check_id": "alex_035_02"
}
Complete grading specification
{
  "type": "tool_trace",
  "config": {
    "check_version": 2,
    "today": "2028-01-01",
    "assertions": [
      {
        "type": "field_equals",
        "tool": "post_doc_comment",
        "action_id": "alex_035_post_doc_comment",
        "path": "result.ok",
        "value": true,
        "check_id": "alex_035_00"
      },
      {
        "type": "field_equals",
        "path": "result.comment.doc_id",
        "value": "doc_1678111200004",
        "tool": "post_doc_comment",
        "action_id": "alex_035_post_doc_comment",
        "check_id": "alex_035_01"
      },
      {
        "type": "field_llm_judge",
        "path": "result.comment.body",
        "criterion": "The historical correction gives the planned 30% to 60% to 95% to 100% progression with a 48-hour soak at each step and says the plan depended on staging not looking weird. It does not present the 2023 plan as a current rule.",
        "tool": "post_doc_comment",
        "action_id": "alex_035_post_doc_comment",
        "check_id": "alex_035_02"
      }
    ]
  }
}
App stateDownload JSON
Source file

tests/alex/035.yaml

SHA-256: 7d0678104a9010b06928c3c7688a4d279b3f58ab5f8bee92c64289fc28f6fce4